
Small Hydropower Rossia Referat
Barsucco hydropower - Group of GEC on the Great Stavropol and the innocent Channel in Stavropol. Coming from Cuba ' s GEC-3, Cuba ' s GEC-4 and the Swiss GEC, as well as the design of a small Barzuchkov GEC. They enter the Cuban GEC cascade.
Cuba ' s GEC-3 and GEC-4 are located on the Grand Stavropol Canal (Barsucco discharge Canal), the Swiss GEC is located on the innocent channel, taking water from the mouth. Cuba for the irrigation and flooding of the lands of the Stavropol province. GPPs use water levels on the channel track, working at the peak of the load schedule. Cuba ' s GEC-3 and GEC-4 have been designed by the Medellhydroproject Institute. The Barsucco hydropower is part of the branch of the " Kascade Cuban GEC " of the OAO " Rusgidro " .
At the post. The Andropov region. GEC began construction in 1964, the first hydroagate was launched in 1971. Built by derivative type, has a daily management pool and a levelling reservoir. GPP capacity - 87 MW, average annual production - 200, 9 million kWh.
It is located in the Kochubeev district on 26 kilometres of the Barsuckovsk discharge channel. GEC began construction in 1964, the first hydroagate was launched in 1970. Built by a derivative type, has a daily management pool and a levelling reservoir, the station project is similar to the GES-3 project. GSE 78 MW, average annual production 181, 5 million kWh.
The Barsuccian small GEC is designed on the idling of the elevating reservoir of Cuba ' s GEC-4 and will use the excess water discharged from the post-translation of the innocent RGE into a revolving water supply system. The project is included in the investment programme of the Ruse Gedro OAO, planned for operationalization 2017. Planned power of GEC - 5, 04 MW, average annual electricity generation - 30, 6 million kWh. There are plans to install three hydro-aggregates in the GES building, which are run-in at 13, 4 metres.
The original draft of the GSE was developed by the New Energy Foundation, controlled by Ruse Gedro. For this project, the ECO structures consisted of:
- A water receiver with a sorrowing bar;
- Trinity derivative (each filament has a length of 55 m and a diameter of 1, 6 m);
- GEC building;
- FR 10 kV.
Share this Post
Related posts
Development Of Small Hydropower In Roses
Currently, there are 11 small hydropower stations operating in the territory of Carelia. The construction of two more will…
Read MoreSmall Hydropower In The Republic
In June 2011, an agreement was signed between the Government of the Republic of Komi and the Nord Gidro zaO on the creation…
Read More